Back to Home
Global B2B GroupGlobal B2B GroupGlobal B2B Group

Custom & Special-Purpose Industrial Machinery

Custom Machinery & Complete Production Lines — Built Around Your Process, Not a Standard Catalogue

Tell us what the process needs to achieve — we help identify and coordinate the right manufacturers. We do not build the machines ourselves: Global B2B Group structures the requirement and the RFQ, sources qualified machine builders and integrators, and coordinates multi-supplier projects on the buyer's side.

100% free for buyers · guided by human experts

Custom special-purpose machine on an industrial factory floor

What we source

Special-purpose machines

Purpose-engineered equipment when no standard machine fits the process.

Complete production lines

Infeed to palletising, with several machines and suppliers integrated into one line.

Packaging & filling lines

Filling, capping, labelling, cartoning, wrapping and end-of-line robotics.

Industrial automation

Robotics, controls, vision and intralogistics — retrofit or greenfield.

OEM & contract manufacturing

Private-label and contract production capacity in vetted plants.

Turnkey factories (EPC)

Engineering, procurement, construction and commissioning as one scope.

Complete automated production line inside a modern factoryHigh-speed packaging and filling line with bottles

Problems we handle

"No machine exists off the shelf"

The product, format or tolerance has no catalogue solution, so the machine has to be engineered around the process.

"A manual step needs automating"

A labour-heavy or inconsistent operation needs a machine that matches cycle time, safety and quality targets.

"Several machines must become one line"

Separate machines from different builders need integrating into one line with shared controls and acceptance tests.

"An unusual product"

A product with an unusual shape, material or hygiene need calls for adapting an existing machine design, or engineering a new one.

"A fixed factory layout"

Equipment has to fit the space, utilities and material flow you already have.

"Several OEMs, one project"

Multiple manufacturers need one specification, one schedule and clear interface responsibility.

Cross-industry examples

Fish processing and cooling line

Custom handling, processing and chilling integrated into one line. Fish farm equipment belongs to FishMatch.

Vertical projects: FishMatch →

Refrigeration-integrated production line

A line where cooling is part of the process. Cold storage buildings and suppliers belong to ColdMatch.

Vertical projects: ColdMatch →

Special packaging line

Filling, sealing, cartoning and palletizing for a non-standard pack format.

Custom conveyor and handling system

Conveying, buffering and transfer designed around a layout and product.

Industrial sorting and inspection

Vision, weighing or reject systems built for a specific product and defect.

Factory automation retrofit

Robotics and controls added to an existing line without a full rebuild.

Custom machinery: direct answers

What is special-purpose machinery?
Special-purpose machinery is equipment designed for one specific process, product or format when no catalogue machine meets the required output, tolerance or hygiene standard. It is engineered around the part, cycle time and factory layout rather than adapted from a standard model.
Can a machine be built for a process that has no standard solution?
Often, yes — that is what engineered-to-order machine builders do. Feasibility depends on the process physics, required output, budget and lead time. A structured requirement lets several builders assess feasibility before anyone commits; no matching machine is guaranteed to exist.
How do you source a complete production line?
Define the product, output and quality targets first, then split the line into process steps, decide between one turnkey integrator or several OEMs with a lead integrator, issue one structured RFQ, compare quotations on scope and total cost, and tie payments to factory and site acceptance tests.
Who coordinates multiple machinery suppliers?
Either a system integrator under one contract, or the buyer through a coordinator who owns the interface list, schedule and acceptance tests. Global B2B Group can take that buyer-side coordination role; it does not build the machines.
How do you write an RFQ for custom machinery?
Describe the process outcome, not a machine: product and formats, required output, tolerances, materials in contact, utilities, space, standards, automation level, budget range, delivery target and measurable acceptance criteria. Ask every builder to quote against the same structure.
What information does a custom machine supplier need?
Product samples or drawings, output per hour or shift, input and output conditions, dimensions and materials, the available space and utilities, required safety and hygiene standards, factory location, budget range and target delivery date.

How the process works

1 · Technical brief

We translate your process, throughput and standards into a buyable specification.

2 · Qualified suppliers

A shortlist of qualified manufacturers, checked for capability and references.

3 · Commercial terms

Comparable quotations, guarantees, spare parts, FAT/SAT and payment structure.

4 · Financing & delivery

Leasing, ECA cover or project finance, then installation and commissioning.

Markets served from this desk

United Kingdom · United States · Gulf · India · Africa

Frequently asked questions

What is a special-purpose machine (SPM)?
A special-purpose machine, often abbreviated SPM, is equipment engineered for one specific process or product when no catalogue machine meets the required throughput, format, tolerance or hygiene standard. It is designed around your part, cycle time and factory layout rather than adapted from a standard model.
What is the difference between a special-purpose machine and standard equipment?
Standard equipment is bought from a catalogue with fixed capability and short lead times. A special-purpose machine is designed, built and validated for your process, so it carries engineering time, a design review, acceptance testing and a longer lead time, but removes manual steps or quality losses a standard machine cannot.
How do you choose a special-purpose machine builder?
Compare builders on proven machines for a similar process, in-house design and controls capability, references you can call, spare-parts and service response in your country, and their willingness to accept measurable FAT and SAT criteria. Price alone is the weakest selection signal on custom equipment.
What should an SPM specification include before asking for quotations?
Product and format range, target cycle time and output per shift, quality and tolerance limits, materials in contact with product, utilities and footprint, control and safety standards, integration with upstream and downstream equipment, and the acceptance criteria the machine must pass.
How much does your service cost buyers?
Nothing. Our procurement service is free for buyers; we are compensated on the supply side and never sell our own equipment.
Can you also arrange financing?
No. Global B2B Group helps map appropriate financing pathways and may introduce qualified projects to independent third-party financing providers for evaluation. It does not lend, underwrite, guarantee funding or control rates or terms. Common pathways include equipment leasing, export credit cover and development finance.
How long does a machinery project take?
A specification and shortlist typically takes 2–4 weeks; build and commissioning depend on scope, usually 4–12 months.

Talk to us in your market

Pick your country and start on WhatsApp or send the brief through the contact form. A specification engineer replies — never a bot.

United Kingdom

Free for buyers · Reply within one business day

United States

Free for buyers · Reply within one business day

United Arab Emirates

Free for buyers · Reply within one business day

India

Free for buyers · Reply within one business day

South Africa

Free for buyers · Reply within one business day

Country-specific questions

United Kingdom

Can you source special-purpose machinery for a UK factory?
Yes. We specify the machine, shortlist qualified European and Asian builders, level quotations in GBP and manage UKCA/CE conformity, delivery to site and commissioning support in the United Kingdom.
How is machinery imported into the UK after Brexit?
We plan customs classification, duty and VAT treatment, Incoterms and inland transport before order placement, so landed cost in the UK is known at quotation stage rather than after shipment.

United States

Do suppliers deliver US-compliant machines?
We only shortlist builders able to deliver UL/NFPA 79 electrical design, imperial utilities and 480V/60Hz power, with US-based or contracted service coverage for the installed base.
Is financing available for US buyers?
Yes — equipment leasing, vendor finance and export credit from the supplier's country are all mapped for the project before you commit capex.

United Arab Emirates

Can you support free-zone projects in the UAE?
Yes. We handle equipment scope for Jebel Ali, KIZAD and other free zones, including civil interface data, high-ambient design (up to 50°C) and Gulf-standard documentation.
Who handles installation in the Gulf?
The selected builder supplies supervision; we contract local mechanical and electrical installation partners and hold them to the same commissioning milestones.

India

Do you source machinery for Indian plants?
Yes — imported European lines, Indian-built equipment, or hybrid scopes where the core machine is imported and utilities are built locally to reduce capex.
What about duties and BIS requirements?
Customs duty, IGST and any BIS or CE documentation requirements are checked during specification, so nothing blocks clearance at port.

South Africa

Can you deliver into South Africa and SADC?
Yes. We handle Durban and Cape Town port routing, SANS electrical requirements, and spare-part strategies that account for longer replenishment lead times.

Reference projects

Special-purpose machinery projects

Representative buyer-side machinery projects: scope, throughput, capex band, lead time and payback. Every project was specified, sourced and negotiated for the buyer — free of charge.

All projects

Scope ownership

What Global B2B Group handles directly — and what goes to a specialist platform

Define the process first. Define the performance second. Select the manufacturer last. Global B2B Group is the direct home for special machines and production lines that do not belong to one industry vertical; sector projects are handled by the specialist platform that owns that scope.

Handled directly here

Special-purpose and custom machinery

Machines for unusual products or processes where no standard catalogue machine fits.

Production, packaging and filling lines

Complete lines, end-of-line systems and multi-vendor line integration.

Automation, robotics and controls

Robotic cells, material handling, inspection and machine vision, PLC and control integration.

Modernization and capacity work

Debottlenecking, line modernization, machinery replacement, manual-process replacement, capacity expansion.

Cross-sector industrial projects

Turnkey plants and process equipment that do not belong to a single specialist vertical.

This is a project desk, not a product catalogue. The first questions are what must be produced, what problem must be solved, what process is required, what output and quality must be achieved, and what existing equipment the solution must integrate with.

Five project types, five different RFQs

Single special-purpose machine

One machine, defined product and process, clear interfaces to existing equipment.

Automation or robotic cell

A work cell replacing manual steps — cycle time, safety and integration drive the scope.

Retrofit or debottlenecking

An existing line stays; the RFQ must describe what is kept, what is replaced and what must still interface.

Integrated production line

Several packages from several suppliers — battery limits and responsibility split decide the outcome.

Turnkey industrial plant

Cross-discipline project: process, utilities, civil works, controls, acceptance and documentation.

Sector projects and where they belong

Specialist platform for each sector scope within the Global B2B Group ecosystem
PlatformScope it owns
ColdMatch GroupIndustrial refrigeration, cold rooms, refrigerated warehouses, blast freezing, IQF packages, pharma cold chain, cold-chain logistics.
FishMatch GroupFish and shrimp farms, RAS systems, hatcheries, aquaculture water treatment, processing linked to aquaculture projects.
HatchMatch GroupPoultry houses, hatcheries, layer, broiler and breeder projects, poultry infrastructure and farm-linked processing.
SeedMatch GroupCommercial greenhouses, irrigation and fertigation, agricultural water and infrastructure, fertilizer and commercial-seed procurement.
FeedMatch GroupFeed mills, aquafeed and extrusion lines, premix plants, feed ingredients, grain receiving, storage and handling.

Routing is never automatic. A project is reviewed by a person at Global B2B Group first, it keeps one owner and one record wherever it is handled, and a project can include supporting packages from more than one platform.

How readiness is described

Early concept

The business problem is known; product, process or capacity basis is not yet defined.

Needs clarification

Enough is defined to review, but specific inputs are missing before suppliers can quote comparably.

Ready for human RFQ review

Product, process, capacity basis, site data and scope split are complete enough for review.

These are the only readiness labels used. A requirement is never described as approved, engineering approved, verified, supplier matched, bankable or ready to manufacture. Final design, guarantees, certification, installation, commissioning and machinery performance remain with the independent suppliers and contractors the buyer selects. No supplier is contacted and no buyer detail is shared without approval from Global B2B Group.

Structured RFQ checklist & production-line planner

Enter your capacity assumptions to get an indicative annual output and CAPEX planning band, then confirm the eleven RFQ blocks manufacturers need before they can quote comparably. Each block links to the readiness page and to a real person on WhatsApp.

Inputs

Indicative planning result

Nominal capacity
4.80M units/year
Effective at 75% OEE
3.60M units/year
CAPEX planning band
USD 5.04M – 15.12M
RFQ readiness
0% (0/11)

Inputs, assumptions and limitations: the band is derived from your own capacity figures and a broad CAPEX intensity range per project family. It excludes building works, land, duties, working capital and local installation conditions. Indicative planning only — not an engineering design, supplier quotation, performance guarantee or financing approval.

Industrial RFQ readiness — eleven blocks

How do I prepare an RFQ for a custom production line?

Work through the eleven checklist blocks below: product and capacity, inputs and outputs, process and equipment scope, automation and quality, site and utilities, installation and service, budget and timeline, compliance, open assumptions and acceptance-test criteria. Complete blocks make supplier quotations comparable.

How accurate is the planning calculator?

It is an indicative planning estimate derived from your own capacity inputs and a broad CAPEX intensity band per project family. It is not an engineering design, a supplier quotation, a performance guarantee or a financing approval.

What is the minimum project size for human review?

Formal project review, supplier routing and financing-pathway discussion generally start from an expected total project value of USD 250,000. Below that, planning guidance and calculators remain available.

Does Global B2B Group connect buyers directly to manufacturers?

No. Buyers are never automatically connected to a manufacturer or supplier. The Global B2B Group project team review qualifying projects before any appropriate external routing.

Buyers are never automatically connected to a manufacturer or supplier. The Global B2B Group project team review qualifying projects before any appropriate external routing. WhatsApp is a technology-assisted, human-reviewed way to start or continue a project conversation.