Factory utility calculator: requirements to industrial RFQ

Short answer: utility demand scales with output and process type. A 2 t/h food line with heating produces a modelled range of 180–288 kW of electrical load and 1.8–2.88 t/h of steam under this tool's assumptions. Pick your process and capacity for an indicative range.

Connected electrical load180 – 288 kW
Transformer size (incl. 25% margin, pf 0.85)265 – 424 kVA
Electricity per operating day (70% load factor)2 – 3.2 MWh/day
Steam1,800 – 2,880 kg/h
Process & cleaning water8 – 12.8 m³/h
Compressed air1.6 – 2.6 Nm³/min
Cooling / refrigeration120 – 192 kW

Preliminary planning ranges from generic process intensities, not an engineering design. Real demand depends on the recipe, equipment selection, heat recovery and local climate. Suppliers must confirm utilities in their quotation.

How the estimate is calculated

Each process type has a planning intensity per tonne/hour of output for power, steam, water, compressed air and cooling. The low figure is the intensity × capacity; the high figure applies this model's fixed 1.6 multiplier. This range is not a measured equipment-efficiency comparison. Transformer size = kW ÷ 0.85 power factor × 1.25 margin.

Next steps: plan the full line in the production planner, or estimate cost with the CAPEX calculator.

From a planning result to a reviewable project

Use these modelled utility ranges to identify package interfaces before comparing quotations, not to size a final installation.

  1. 1. Define scope

    Record capacity, site and package interfaces.

  2. 2. Confirm evidence

    Request connected and operating loads, peak demand, utility quality, connection conditions and test evidence from each supplier.

  3. 3. Human review

    Buyer service is free for B2B projects from USD 250,000. No automatic supplier outreach.

What does this result not establish?

Process intensities, power factor and margins are internal planning assumptions. Confirm the installation with qualified engineers and the relevant equipment suppliers. Calculator assumptions are not quotations, engineering approval or financing commitments.

Check RFQ evidence Prepare financing information

Send your utility figures with your project

Share the location, application, target capacity and budget band. A member of the team reviews every submission personally — no automatic supplier outreach.

GDPR / UK GDPR compliant · your data is processed on the basis of your consent and legitimate interest. · * Required fields

Global B2B Group is not a manufacturer, EPC contractor or lender and does not guarantee suppliers, pricing, financing or project outcomes. Formal project review generally begins at USD 250,000 and above.