Food processing & packaging projects
Short answer
A food line takes product from intake through processing, inspection and packing to storage. Size it with the line throughput planner and the capacity planner, then build the budget. Global B2B Group handles these projects directly, especially packaging lines for fish, shrimp and greenhouse produce and lines that span several sectors.
What the project usually includes
- Intake, washing and preparation
- Processing: sorting, cutting, cooking, mixing
- Inspection: weighing, metal detection, X-ray
- Packing, labelling and palletising
- Utilities, hygiene and line controls
Exact scope depends on product, capacity, site and timeline. It is confirmed with you before any supplier is approached.
Calculators for this project
Step 1
Line throughput plannerConverts packed output into raw-material flow and peak design capacity.
Step 2
Capacity & throughput plannerTurns rated speed, shifts and losses into real annual output.
Step 3
CAPEX calculatorBuilds a total project budget: equipment, freight, site works, start-up and contingency.
Results are planning estimates from your own inputs, not supplier quotes or engineering designs.
Next step
Global B2B Group handles these projects directly. Every request is reviewed by the Global B2B Group project team before any supplier introduction. Minimum project size USD 250,000; the buyer service is free.

