Project areas

Pick your project area to see what it includes, which calculators to run first and where your request goes.

  • Grain & feed

    Calculators: Capacity & throughput planner, CAPEX calculator, Financing calculator

    Specialist: FeedMatch

  • Poultry

    Calculators: CAPEX calculator, Financing calculator, Capacity & throughput planner

    Specialist: HatchMatch

  • Fish & shrimp

    Calculators: Line throughput planner, Cold storage construction cost, CAPEX calculator

    Specialist: FishMatch

  • Cold storage capacity

    Calculators: Cold storage construction cost, CAPEX calculator, Financing calculator

    Specialist: ColdMatch

  • Food processing & packaging

    Calculators: Line throughput planner, Capacity & throughput planner, CAPEX calculator

    Handled by Global B2B Group

Choose the scope before choosing a calculator

This index separates production capacity, processing and storage projects. It is not a list of available equipment or completed installations. Start with the product and the change you need: growing or producing it, preparing and packing it, or holding it at the required temperature. A purchase of food itself is a different task from buying the machinery that produces or handles it.

For grain and feed, define incoming material and finished output; for poultry, distinguish houses, hatchery, egg handling and processing. For fish and shrimp, distinguish farming systems from processing, freezing and packing. Cold storage adds a holding-capacity and temperature question. Food processing and packaging adds the product flow, pack format and line interfaces. The linked area pages show the relevant scope and specialist platform.

Keep capacity, cost and financing assumptions separate

  1. Define the output basis. Record the product, unit, target throughput, working shifts and expected losses. Pallet positions measure storage capacity; packs per hour measure a packaging line. Do not compare these as interchangeable capacity figures.
  2. Set the cost boundary. Separate equipment from freight, site works, installation, start-up and contingency. Identify who supplies each interface and utility. Keep unknown items open; an equipment-only quotation is not a total installed-project budget.
  3. Review financing separately. Enter the proposed loan structure only after the budget basis is clear. A calculated payment or coverage ratio is a planning result, not a lender's offer or an eligibility decision.

Use dated supplier quotations where available and label other figures as estimates with their sources and assumptions. The calculations linked here use your inputs; they do not confirm supplier availability, engineering suitability or project cost.

Buying produce, seafood or eggs rather than a production asset? Start with the food purchase specification and quotation guide. Keep infrastructure needs separate so the team can review the correct request.

Green, fresh, alive

From seed to shelf — the same discipline, a greener result

Greenhouses, fresh produce, fish and shrimp packaging lines: every project is specified, sourced and compared before an introduction is made.

Start a project
Rows of vivid green lettuce, herbs and young plants inside a modern glass greenhouse