Project planning
Industrial project cost planner by country
Choose a project country and enter your own assumptions. See a direct CAPEX answer, the cost formula and an undiscounted total-cost estimate before preparing a reviewed RFQ.
Project assumptions
USD figures below are editable hypothetical starting points, not prices for your country.
Cost answer
$1,375,000 Estimated project CAPEX
- Equipment CAPEX
- $920,000
- Installed CAPEX
- $1,250,000
- Contingency
- $125,000
- 10-year total cost (undiscounted)
- $3,175,000
How the answer is calculated
Installed CAPEX = machinery + auxiliaries + freight + installation + civil works. Project CAPEX = installed CAPEX + contingency. 10-year total cost = project CAPEX + ($180,000 annual OPEX × 10).
No country-specific price is implied by selecting a country. Taxes, duties, financing, local constraints and engineering validation are excluded. Replace all assumptions with verified project figures before procurement.
Prepare the project request
Carry these editable assumptions into an RFQ. Global B2B Group reviews the brief; no supplier receives it automatically. Any introduction requires David or authorized-team approval.