A packhouse is judged on yield and shelf life, not on line speed alone. Reception, pre-cooling, grading and sorting, packing and cold storage each affect product quality, and each comes from a different manufacturer base. This profile sets out how the packhouse scope is split into tenderable packages and what has to be defined before an RFQ is issued.

This is an anonymized scope profile describing how projects of this type are structured and procured — not a client case study. Figures are scope bands, not quotations.

Typical crops
Citrus · Apples and stone fruit · Berries · Tomatoes and peppers · Root vegetables
Scale bands
Single-line packhouse · Multi-line regional facility · Integrated export hub
Quality driver
Time from harvest to pre-cooling, plus handling gentleness
Buyer cost
Free — Global B2B Group is paid by the supply side

How the scope splits into tenderable packages

Reception and tipping

Bin tipping (dry or water), destoning, debris removal and buffer conveying sized to harvest peaks.

Pre-cooling

Forced-air, hydro or vacuum cooling selected by crop; pull-down time targets and room turnover.

Grading and sorting

Optical sorters for size, colour, defect and internal quality; calibration and reject handling.

Packing and palletising

Weighers, trays, punnets, bags, labelling, case erecting, palletising and stretch wrapping.

Cold storage and dispatch

Chilled or controlled-atmosphere rooms, dock buffer and loading interface.

Hygiene, water and controls

Wash water treatment and recirculation, sanitation zones, traceability and line control system.

Procurement sequence

  1. 1. Define crop mix and season profile

    Tonnes per hour at seasonal peak, crop switchover frequency and pack formats define every machine in the line.

  2. 2. Fix the quality standards

    Export market requirements, residue and traceability regimes and food-safety certification go into the RFQ.

  3. 3. Size pre-cooling first

    Pull-down time targets set cooling capacity; under-sized pre-cooling costs shelf life no sorter can recover.

  4. 4. Split into packages

    Reception, cooling, sorting, packing and cold storage tender separately with one schedule and interface matrix.

  5. 5. Qualify on crop references

    Reference installations for the same crops, gentleness of handling, local service and spare parts.

  6. 6. Attach financing

    Agricultural development lines, ECA cover for imported sorters and leasing for packing equipment.

Risks and controls

RiskControl
Bruising and quality loss on transfersSpecify drop heights and gentle-handling requirements per crop in the technical scope.
Pre-cooling under-sized at harvest peakSize on peak daily intake and required pull-down time, not on annual tonnage.
Sorter performance disputesDefine acceptance tests with agreed sample lots, grading accuracy and throughput at rated quality.
Changeover time between cropsRequire stated changeover and cleaning times in the bid, with a witnessed demonstration.

Financing routes commonly assessed

  • Agricultural and agri-processing development-bank lines
  • Export credit agency cover for imported grading and packing equipment
  • Leasing for packing, labelling and palletising equipment
  • Vendor and trade finance on the supply contract

Eligibility depends on jurisdiction, equipment origin and sponsor profile. Financing Center

Questions buyers ask

What equipment does a fruit and vegetable packhouse need?

Reception and tipping, pre-cooling, grading and optical sorting, packing and palletising, cold storage and dispatch, plus wash-water treatment and line controls. Each is a separate tender package with different specialist manufacturers.

How is packhouse capacity defined for an RFQ?

By tonnes per hour at seasonal peak for each crop, with pack formats, changeover frequency and required pre-cooling pull-down time. Annual tonnage alone under-sizes the line and the cooling capacity.

Do buyers pay for packhouse procurement support?

No. Scope preparation, supplier qualification and bid comparison are free for buyers; Global B2B Group is compensated on the supply side.