Short answer
A typical mid-size production line in Colombia with USD 920,000 of equipment reaches about $1,271,050 total project CAPEX once freight, installation, civil works and a 10% contingency are added, and about $3,071,050 total cost of ownership over 10 years with USD 180,000 annual OPEX. Use the calculator below with your own figures.
The formula
- Equipment CAPEX = core machinery + auxiliary equipment
- Installed CAPEX = equipment CAPEX + freight + installation & commissioning + civil works & utilities
- Project CAPEX = installed CAPEX × (1 + contingency %)
- TCO = project CAPEX + annual OPEX × asset life (years)
Local adjustment: installation and civil-works defaults for Colombia use an indicative cost-level factor of 0.65 (Western-Europe baseline = 1.00). Imported machinery is priced in USD and is not scaled. Local currency: COP.
Worked example
| Core machinery | $800,000 |
| Auxiliary equipment | $120,000 |
| Freight & logistics | $60,000 |
| Installation & commissioning (150,000 × 0.65) | $97,500 |
| Civil works & utilities (120,000 × 0.65) | $78,000 |
| Installed CAPEX | $1,155,500 |
| Contingency (10%) | $115,550 |
| Project CAPEX | $1,271,050 |
| TCO over 10 years ($1,271,050 + 180,000 × 10) | $3,071,050 |