FAT vs SAT: acceptance testing for machinery
Agree how equipment will be proven before you sign the contract.
Short answer
What does a factory acceptance test check?
FAT is the last chance to find problems cheaply, before crating and shipping.
- Mechanical build and documentation against the specification
- Control logic, safety functions and alarms
- Dry runs or test runs with representative material where possible
- Agreed punch list before release for shipment
What does a site acceptance test check?
SAT confirms installed performance: output rate, quality, utility consumption and integration with upstream and downstream equipment, measured under conditions agreed in advance.
What should the RFQ say about acceptance?
- Test location, duration and who attends
- Measurable criteria: output, reject rate, uptime, consumption
- Materials the buyer must supply for testing
- Link between acceptance milestones and payment
- Remedies if criteria are not met
Quick questions
Is FAT always required?+
It is strongly recommended for custom or high-value equipment. For standard catalogue items, a documented test report may be sufficient.
Who pays for FAT travel?+
It is negotiable. State it in the RFQ so all suppliers quote on the same basis.
Can payments be tied to FAT and SAT?+
Yes. Many contracts link a payment milestone to successful FAT and the final milestone to SAT sign-off.
Summary
- FAT proves the machine at the factory; SAT proves it in your plant
- Define measurable acceptance criteria in the RFQ
- Link milestones and remedies to test results
Global B2B Group is an independent, human-reviewed procurement channel — not a manufacturer, contractor or lender. Figures and methods here are general guidance; confirm project-specific details with qualified advisers.
Continue with our commercial resources
Hand-picked next steps for this topic — special purpose machinery and industrial project financing.