FAT for custom machinery: what to test and when to pay

A custom machine has no track record. The factory acceptance test is where you prove it works before it ships.

Published 2026-09-30·Global B2B Group Editorial Standards Board·~6 min read
Buyer inspection team watching a custom machine run during a factory acceptance test

Why is FAT more important for custom machines?

Standard machines have references running the same model. A custom machine is often the first of its kind, so the FAT is the first real evidence that the design meets your process.

Which criteria should the FAT measure?

Every criterion should be measurable and linked to the requirement in your RFQ.

  • Output per hour at the stated product format
  • Continuous run time without stoppages
  • Reject or defect rate
  • Format changeover time
  • Safety functions, guarding and emergency stops
  • Documentation and software backups delivered

What product should be used for testing?

Send enough of your real product or packaging to run a meaningful test. Tests on substitute material often hide problems that appear on site.

What happens if the machine fails FAT?

The builder corrects the issue and the test is repeated at its cost, within an agreed period. Repeated failure should trigger remedies defined in the contract.

Packaging lines, production lines and calculators

Global B2B Group's main line is packaging and production lines — for fish, shrimp, greenhouse produce and other agri-food products — plus custom machinery, for projects from USD 250,000 with human review before any supplier outreach.

Packaging and production-line guides

Estimate before you send an RFQ

Sector projects go to our specialist platforms

Sector projects such as cold rooms, hatcheries, fish farms, greenhouses or feed mills go to the matching specialist platform. Packaging lines, custom machinery, multi-sector projects, CAPEX planning and financing preparation stay with Global B2B Group, so each buyer has one route and the platforms never compete.

Quick questions

Does passing FAT mean the machine is accepted?+

No. Final acceptance normally follows the site acceptance test (SAT) after installation.

Can FAT be witnessed remotely?+

Remote witnessing is possible for simple checks, but in-person attendance is safer for first-of-a-kind machines.

Who pays for a repeated FAT?+

Normally the builder, if the first test failed against agreed criteria.

What should a FAT for a food packaging line test?+

Run the line with your real product and packaging film or trays: output per minute, weight or fill accuracy, seal integrity, reject rate, changeover time between formats and a sustained run. Agree pass/fail values in the RFQ.

Summary

  • Agree measurable FAT criteria in the contract
  • Test with your real product
  • Link the pre-shipment payment to a signed, passed FAT

Global B2B Group is an independent, human-reviewed procurement channel — not a manufacturer, contractor or lender. Figures and methods here are general guidance; confirm project-specific details with qualified advisers.

Continue with our commercial resources

Hand-picked next steps for this topic — special purpose machinery and industrial project financing.

Email updates

Sourcing intelligence and buyer guides, by email

Choose the topics, language and frequency you want. We send a confirmation link first and nothing else until you confirm. Each digest links to the full articles on the site.

Signing up is not a sourcing request.

Sector updates from our specialist platforms

Topics
How often

We use your email only for these updates and never share it with suppliers. Every email has an unsubscribe and preferences link. Privacy policy

Share this article