Factory Acceptance Test (FAT)

Also called: FAT

Factory Acceptance Test (FAT) — definition

Formal verification test conducted at the supplier's manufacturing facility to confirm equipment meets agreed specifications before shipment to site.

A factory acceptance test typically involves running the equipment under simulated or actual production conditions in the presence of buyer representatives, checking performance, safety functions and documentation against the contract specification. Successful completion is commonly a condition for releasing a payment milestone and authorising shipment.

Why it matters to industrial buyers

Identifying defects or deviations at the factory, before shipment, is generally far less costly and time-consuming than discovering them after the equipment has arrived on site.

Key reference points

Common triggers linked

FAT completion is frequently tied to a payment milestone and shipment authorisation.

Typical scope

Usually covers functional performance, safety interlocks, control system operation and documentation completeness.

Commonly confused with

  • Site Acceptance Test (SAT)

    FAT verifies equipment performance at the supplier's factory before shipment; SAT verifies performance after installation at the buyer's site, under actual site conditions.

How it is used in practice

Buyer representatives travel to the supplier's facility to witness the factory acceptance test of a packaging machine before it is authorised for shipment.

Frequently asked questions

Is buyer attendance at FAT mandatory?

It is not always mandatory but is common practice for significant equipment purchases, and is often specified in the contract.

What happens if equipment fails the FAT?

The supplier typically corrects deficiencies and a re-test is conducted before shipment is authorised.

Go deeper on the platform

Related terms

Site Acceptance Test (SAT)

Formal verification test performed after equipment installation at the buyer's site, confirming it operates correctly under actual site conditions and integrations.

Commissioning

Systematic process of testing, adjusting and verifying that installed equipment and systems operate together as designed before handover to operations.

Payment Milestones

Predefined points in a contract at which agreed portions of payment become due, typically linked to design approval, manufacturing progress, shipment and acceptance.

Cycle Time

Cycle time is the elapsed time required for a machine or process step to complete one full repeatable operation, from the start of one unit to the start of the next.

Detailed Engineering

Detailed engineering is the project phase that converts basic design outputs into fully dimensioned drawings, control philosophy and component specifications ready for fabrication and procurement.

Lead Time

Elapsed time between order confirmation and delivery or readiness of equipment for shipment, encompassing engineering, manufacturing, testing and logistics.

Letter of Credit (LC)

Payment instrument issued by a bank on behalf of a buyer, guaranteeing payment to a seller upon presentation of specified documents that confirm contractual obligations have been met.

Machine Capability Study

Machine capability study is a statistical assessment of a machine's ability to consistently produce output within specified tolerances under short-term controlled conditions.

Machine Design Cycle

Machine design cycle describes the sequence of stages, from concept through basic design, detailed design, build, testing and handover, that a piece of custom equipment passes through.

More in Project Delivery & Governance

Reference content only. Global B2B Group is independent of equipment manufacturers and financing institutions; definitions are provided for education and do not constitute engineering, financial or legal advice.

Home